Troisdorf – Sieglar/Eschmar bypass (L 332n)

Reduction of traffic congestion between Troisdorf-Eschmar and Troisdorf-Sieglar through the construction of an approx. 4 km long bypass. Implementation in two construction phases of approx. 2 km each. Completion of the first construction phase in 2017, completion of the second construction phase in 2023.

Client
Landesbetrieb Straßenbau NRW – Road construction authority of North Rhine-Westphalia
Services KOCKS ENGINEERS

Road design and design for drainage including structural design; construction supervision; health and safety coordination; ecological construction monitoring.

Hückelhoven-Ratheim and Millich bypass (L 117n)

New construction of the 4 km long bypass to relieve congestion on the through-road, including a new junction to the A 46 motorway and a car park. The overall project also includes several bridge structures, noise barriers, drainage facilities and a pumping station. The project will be realised in several construction phases.

Client
Landesbetrieb Straßenbau NRW – Road construction authority of North Rhine-Westphalia
Services KOCKS ENGINEERS
Road design; sewerage system; engineering structures; structural design; technical equipment; preparation of the signposting concept in the L 117n impact area; line coordination; traffic management during construction.

Upgrading of CAREC road corridor Dushanbe-Kurgonteppa, Tajikistan

Widening of the inter-regional trunk road south of Dushanbe from two to four lanes as part of the IFI-ADB-III financing package. Overall design and construction supervision of carriageway rehabilitation and new construction, installation of new safety facilities and capacity building of the client (Ministry of Transport Tajikistan) on road safety and road management.

Client
Ministry of Transport Tajikistan
Services KOCKS ENGINEERS

Contract supervision; project management; environmental monitoring; resettlement monitoring; road safety audits; financial management support to the client; detailed design for selected works of component 2.

Ausbau der B 266 zwischen Schaven und Lohmühle (Prüfen: Referenz doppelt!)

Verkehrliche Ertüchtigung zwischen der Anschlussstelle Wißkirchen (BAB A 1) und der Ortsumgehung Mechernich-Roggendorf durch den Ausbau der B 266 auf knapp 2 km. Grundhafte Erneuerung der Bundesstraße auf 800 m und Ausbau östlich des Knotens B 266 / B 477 / Mechernicher Weg bis Lohmühle zur Herstellung des Lückenschlusses.

Client
Landesbetrieb Straßenbau NRW / Stadt Mechernich
Services KOCKS ENGINEERS
Objektplanung Verkehrsanlagen und Regen- und Schmutzwasserkanalisation; Landschaftspflegerischer Begleitplan; Umweltbericht; Ingenieurbauwerke; Tragwerksplanung; Bauzeitliche Verkehrsführung; Bauüberwachung; Leitungskoordination

Eight-lane widening of the A 40 motorway including replacement of the Rhine bridge Duisburg-Neuenkamp

Multidisciplinary design of the new construction of the Rhine bridge Duisburg-Neuenkamp by the consortium Leonhardt, Andrä und Partner AG (Rhine bridge) and Kocks Consult GmbH (traffic system, drainage, noise protection) for DEGES. Construction of the upstream section of the structure in a temporary lateral position with subsequent transverse shifting. Design of the traffic facilities, including temporary traffic routing and construction site access. Design of the drainage including structural engineering.

Client
DEGES GmbH
Services KOCKS ENGINEERS

Road design and design of the drainage systems including structural design; technical contribution on noise protection, design of noise protection measures; proportionality test according to § 41 (2) BImSchG (German Federal Immission Control Act); construction logistics; construction site management; assistance in the public participation procedure; assistance in the discussion procedure; adaption planning during construction.

Bebauungsplan und Erschließungsplanung Investorenvorhaben „Horchheimer Gärten“, Koblenz

Städtebauliche Neuordnung einer ca. 1,7 ha großen Fläche im Bereich des ehemaligen Soldatenschwimmbades, Koblenz-Horchheim. Planungsrechtliche Umsetzung im Rahmen der Bauleitplanung (B-Plan, Umweltbericht und FNP-Änderung) auf Basis eines kommunalen Auslobungsverfahrens. Erschließungsplanung für Entwässerung, versorgungstechnische Erschließung, Straßenbau und Lärmschutz.

Client
Projektgesellschaft Horchheim-GmbH
Services KOCKS ENGINEERS
Bebauungsplan einschließlich Umweltbericht, parallele Flächennutzungsänderung, Verfahrensbegleitung, Erschließungsplanung Verkehrsanlagen, Versorgungsleitungen, Entwässerungsanlagen und Lärmschutzwand; Bauüberwachung.

Noise protection for the “Horchheimer Gärten” development area

Construction of a new noise barrier to protect the new “Horchheimer Gärten” residential development area near the motorway B 42 in Koblenz. A noise barrier with a height of up to 7 m was realised over a distance of approx. 300 m. The foundations were laid conventionally on bored piles. A pedestrian bridge over the B 42 was integrated into the wall.

Client
Projektgesellschaft Horchheim GmbH
Services KOCKS ENGINEERS

Design and construction supervision of noise barrier.

Main inspection of the Wetzlar elevated road bridge on the motorway B 49

Main bridge inspection in accordance with DIN 1076 of the city centre bridge in the course of the four-lane motorway B 49 over a length of approx. 950 m. The structure was built in the 1980’s using prestressed concrete and crosses several railway tracks, intersections, large car parks and the river Dill.

Client
Hessen Mobil, Dillenburg
Services KOCKS ENGINEERS
Main structural inspection in accordance with DIN 1076; preparation of inspection reports; provision of cherry pickers and crawler equipment; traffic safety.

New firefighting station in Sinzig

New firefighting station for the voluntary fire brigade of the town of Sinzig. Design of the vehicle hall for eight vehicles, washing hall, hose tower, shower and changing rooms, offices, recreation rooms, operations centre, meeting and training rooms. Power installations, telecommunications and information technology systems. Planning of the technical phases for heat supply via an air/water heat pump and gas condensing boiler for peak load coverage. Design of ventilation, cooling, sanitation and compressed air supply.

Client
City of Sinzig
Services KOCKS ENGINEERS

Design for electrical engineering and technical building equipment; liaising and coordinating with the responsible planner for the fire brigade technology.

Radeberger Brewery Frankfurt/Main: Modernisation of the electrical engineering and heating/ventilation/sanitation facilities in the craftsman’s house

Gutting and clearance of the premises, fire protection partitioning of the ground floor and basement. Design and installation supervision of low-voltage switchgear, low-voltage installation systems, lighting systems, lightning protection and earthing system, public address system, fire alarm system, heat supply systems/district heating, sanitary and ventilation systems.

Client
Radeberger Gruppe KG
Services KOCKS ENGINEERS
Design and construction supervision.

Extension of the existing “Rhein-Zeitung” printing plant

Extension of the buildings for production and postal logistics, including office and social rooms. Design and installation supervision of: three gas condensing boilers with 500 kW heat output each; sanitary facilities; compressed air supply; reverse osmosis system (demineralised water); ventilation technology for both halls with a total air volume flow of 160,000 m³/h, rotary heat exchanger, full air conditioning system, steam humidifier.

Client
Mittelrhein-Verlag GmbH
Services KOCKS ENGINEERS

Design for technical building services; construction supervision.

Main inspection and new construction of the Dausenau bridge

Main structural inspection of a three-span, approx. 115-year-old concrete bridge in Dausenau (river Lahn), which connects the neighborhood on the hillside across two tracks. Due to the poor condition of the structure, the road bridge over the railway tracks will be replaced by a concrete slab construction on sheet pile abutments.

Client
Municipal administration and municipal works of Bad Ems-Nassau
Services KOCKS ENGINEERS
Main structural inspection in accordance with DIN 1076; provision of rehabilitation concept for existing structure, design and structural of the new bridge structure, local road, drinking water pipeline; construction supervision.

Construction of a new production plant for the chemical industry, Cologne

Construction of a new production building in steel and solid construction. Construction of tank foundations in reinforced concrete retention basins and of various pipe bridges in steel construction.

Client
SpiraTec Engineering GmbH
Services KOCKS ENGINEERS

Support in drawing up specifications; structural design; formwork and reinforcement plans; steel construction overviews.

Deep pile foundation over a peat bog

Construction of an overpass of the L 354n road over the river Niers near Mönchengladbach. In the area of a peat bog. The ramps have to be founded on driven piles in a grid of approx. 2 x 2 metres with a pile length of 8 metres. The bridge itself is founded as a single-span structure on in-situ concrete piles.

Client
RWE Power AG, Cologne
Services KOCKS ENGINEERS
Variant analysis and design for the deep section foundation and bridge; application for authorisation under water law for the temporary stream piping.

New construction of finishing plant, Andernach

New construction of a steel hall (L / W / H = approx. 300 / 35 / up to 30 m) with crane operations (6 cranes up to 35 tons) for a tinplate finishing plant for the packaging industry, including several connecting structures. Construction of a media trough to house the production technology and of a switching house for the power supply, both in solid construction. New construction of the outdoor traffic areas.

Client
thyssenkrupp Rasselstein GmbH
Services KOCKS ENGINEERS

Structural design; BIM-orientated 3D design.

New underpass for a works road under the L 315 near Berod

Construction of an underpass for a works road under the L 315. Via this underpass mineral raw materials can be transported between extraction and processing without crossing public roads, thus contributing to road safety and more efficient material transport. Construction of the structure as a reinforced concrete slab on tangential in-situ concrete piles.

Client
Marx Bergbau GmbH & Co. KG
Services KOCKS ENGINEERS
Design for underpass; structural design; construction supervision; health and safety coordination; construction logbook, main and secondary inspections.

Installation of a hot forming press

Installation of a hot forming press in the existing press shop. Dismantling of the existing systems and components. Preparation of a new substructure for press support and new construction and restauration of ceilings. Provision of the media and electrical supply.

Client
Opel Automobile GmbH
Services KOCKS ENGINEERS

Design; structural design; design for technical facilities; construction supervision; health and safety coordination.

Construction supervision for the installation of new cable trays as part of the construction of the Riederwald Tunnel

Construction of cable conduit systems to accommodate cables of the 0.4-30 kV network as well as 110 kV high-voltage cables, including the sectional laying of pipelines of the drinking water and gas supply network. Pressing of protective pipes under railway tracks and soil preparation with subsequent liquid soil installation. Supervision of liquid soil installation by a certified quality assurance officer. Liquid soil according to RAL quality mark 507.

Client
Grid Services "Netzdienste Rhein-Main GmbH"
Services KOCKS ENGINEERS
Construction supervision for civil engineering, including cost, quality and construction time control.

Cable renewal Frankfurt-Ginnheim

Renewal of the low and medium-voltage grid with a total length of around 10 km in a district in Frankfurt-Ginnheim.

Client
Netzdienste Rhein-Main GmbH
Services KOCKS ENGINEERS

Local survey of all properties to be supplied; route coordination; design and tendering of all cable systems to be renewed.

Project and development plan no. 318 for the “Fährhaus” hotel on the banks of the Moselle, Koblenz

Creation of the legal basis for the conversion and extension of the hotel “Fährhaus” into a modern hotel with 47 rooms / suites and a restaurant with an adjoining conference and wellness area.

Client
Hotel am Moselstausee Immobilien GmbH & Co. KG
Services KOCKS ENGINEERS
Urban planning services for the development plan; assistance in approval procedures; environmental assessment and environmental report; expert review on nature conservation and on flora and fauna habitat impact assessment; traffic planning.

Azerbaijan Highway III Programme

Internationally financed new construction of a four-lane motorway section between Baku and the Iranian border over approx. 50 km, including the country’s largest arch bridge with a free span of 150 m over the River Kura.

Client
Azer Afteryol Services
Services KOCKS ENGINEERS

Construction supervision and project management including cost, quality and construction time control; review of design and contract documents and supplementary management; safety audits, monitoring of environmental protection measures and social compatibility.

Rehabilitation of railway line between Baku and Russian border, Azerbaijan

Renewal of the double track system on the railway line between Yalama and Sumgait over a length of approx. 167 km, north-south corridor, Azerbaijan. Construction supervision and project management consulting in consortium with the engineering company “SSF Ingenieure”.

Client
Azerbaijan Railways CSJC
Services KOCKS ENGINEERS
Construction supervision and project management including cost, quality and construction time control; review of design and contract documents; supplementary management; monitoring of environmental protection measures and social compatibility.

Modernisation of the railway line from Kovel via Yahodyn to the Polish border  

Modernisation of approx. 60 km of railway line with different track gauges in order to achieve a better connection of the Ukrainian rail network to the European Union.

Client
European Investment Bank
Services KOCKS ENGINEERS

Feasibility study; analysis of variants (routing and technical equipment); cost-benefit calculations; preparation of an investment plan; environmental and social studies; land acquisition planning; draft design.

Upgrading of the Trans European Road Network, Malta

EU-funded modernisation of the road network in Malta and Gozo. Five construction lots with a total length of 9.8 km including a tunnel in Valetta.

Client
Transport Malta
Services KOCKS ENGINEERS
Construction supervision and project management including cost, quality and construction time control; review of design and contract documents; supplementary claims management.

Upgrading of Canouan Island Airport, St Vincent and the Grenadines, Caribbean

Upgrading of the runway to make the tourist airport on the island jet-capable. Extension of the runway to 1,070 metres by reclamation of land into the sea. Construction of the new lighting system and tower.

Client
Ministry of Transport & Works
Services KOCKS ENGINEERS

Inventory and preparation of the master plan for the expansion of the airport; environmental impact assessment and economic feasibility study; detailed design; tendering; construction supervision; client consultancy.

Rehabilitation and modernisation of Mazar i Sharif Airport, Afghanistan

Upgrading of the airport in Mazar i Sharif, Afghanistan. Rehabilitation of the old runway (total length 3,160 metres) including the associated drainage system, ILS and lighting system. Land-side development and expansion of the civilian area including terminal, office and administration buildings, drinking water treatment and supply. Upgrading of the airside facilities with apron extension, remodelling of the existing runway. Construction of the new tower cockpit including technical equipment. Supervision of the installation of the MLAT approach system.

Client
Afghan Civil Aviation Authority (project financing KfW)
Services KOCKS ENGINEERS
Feasibility studies and detailed design according to international standards and ICAO guidelines; construction contract according to FIDIC Yellow Book; project management and construction supervision on site.

Determination of the route for the A 553 Rhine motorway link

Investigation of variants for the planned new construction of the A 553 Rhine corridor between the motorways A 555 and A 59 north of Bonn, taking into account the associated junctions and motorway interchanges. Sensitivity analysis for variant selection for 12 identified variants. Support to the client and explanation of the variants in the context of public participation.

Client
State road construction authority of North Rhine-Westphalia (until 2020); The federal motorway company (from 2021)
Services KOCKS ENGINEERS
General design of the measure: Basic assessment, preliminary design of the road, sensitivity analysis for variant selection, noise variant assessment, EIA & flora and fauna habitat preliminary assessment, air pollution investigation, geotechnical preliminary assessment, assessment according to the Directive on the control of major-accident hazards involving dangerous substances (SEVESO-III), categorisation according to the European Agreement…

Upgrading of Wiesbaden motorway junction

Road and intersection design for the upgrading of the motorway junction Wiesbaden A 3 / A 66. In addition, adaptation of the adjoining sections of road and inclusion of two junctions to increase capacity as part of the elimination of bottlenecks in accordance with the Federal Transport Infrastructure Plan 2030.

Client
DEGES GmbH
Services KOCKS ENGINEERS

Basic evaluation and preliminary design for the conversion and upgrading of the motorway junction; design of drainage facilities; coordination with the responsible authorities.

Drinking water pipeline Hochwald

Construction of a 6.8 km long DN 300 drinking water pipeline and a pressure booster station.

Client
Hochwald Foods Whey Ingredients GmbH
Services KOCKS ENGINEERS
Environmental impact assessment; design; construction supervision.