Heating / Air Conditioning / Ventilation

Extension of the existing “Rhein-Zeitung” printing plant

Bilder 1 Images

Extension of the buildings for production and postal logistics, including office and social rooms. Design and installation supervision of: three gas condensing boilers with 500 kW heat output each; sanitary facilities; compressed air supply; reverse osmosis system (demineralised water); ventilation technology for both halls with a total air volume flow of 160,000 m³/h, rotary heat exchanger, full air conditioning system, steam humidifier.

Client
Mittelrhein-Verlag GmbH
Project Manager
Dipl.-Ing. Armin Wagner (TGA)
Services

Design for technical building services; construction supervision.