Leachate treatment plant at Muertendall landfill, Luxembourg

Establishment of the biological leachate treatment plant with downstream activated carbon adsorption at the Muertendall landfill site in Luxembourg. Volume reduction of the bioreactors by using an ultrafiltration system with residue-free discharge and corresponding relief of the downstream activated carbon adsorption.

Client
SIGRE – Intercommunal syndicate for waste management in the regions Grevenmacher, Remich and Echternach, Luxembourg
Services KOCKS ENGINEERS

Design of civil engineering structures for process engineering; machinery equipment, electrical measurement and control facilities, heating and ventilation facilities; structural design; health and safety coordination in accordance with construction site regulations.

Regional Waste Treatment Plant North in R. Vandhoo, Maldives

Design, tendering and construction supervision of the waste treatment plant Vandhoo, consisting of a reception area with a small docking port, a waste incineration plant (60 tonnes/day), an ash landfill (1 ha) including evaporation basin and rainwater drainage, an infrastructure with administration building and control office at the port, as well as roofing for vehicles and waste storage.

Client
Ministry of Housing and Environment, Republic of Maldives
Services KOCKS ENGINEERS
Design; tender documents (FIDIC Red Book and FIDIC Yellow Book); construction supervision; project management.

Maliq landfill, south-east Albania

Regional waste management system for the Korca region with approx. 320,000 inhabitants (60% urban and 40% rural population) in south-east Albania. Construction of a landfill, installation of transfer stations and introduction of a waste collection and transport system. Measures to improve and develop the primary collection, composting and recycling of household waste from the region’s towns and municipalities.

Client
Korca Regional Waste Management Company (KRWM)
Services KOCKS ENGINEERS

Updating of the Regional Waste Management Plan; updating of existing design documentation; detailed design; preparation of tender documents (FIDIC Red Book); participation in the award of contracts; construction supervision; staff training; support in operational management.

Environmental and social impact monitoring in pipeline construction, Caucasus

New construction of the oil pipeline between the Caspian Sea (Azerbaijan) and Rustavi (Georgia).

Client
Oil industry
Services KOCKS ENGINEERS
Environmental and social impact assessments; environmental monitoring; habitat and species mapping; ecological inventory plans; environmental management plans; translocation of fauna and flora; monitoring of habitat restoration; monitoring of complaint management; environmental consulting.

Upgrading of the B 256 federal road near Plaidt – Expert report on nature and species conservation

Needs-based upgrading of the existing two-lane road B 256 in the Plaidt area (Mayen-Koblenz district) to double the width with four lanes. Accompanying landscape conservation plan, faunistic studies, expert report on species protection to determine the impact on particularly and strictly protected animal and plant species, EIA report in accordance with § 16 of the Act on the Modernisation of Environmental Impact Assessment Law.

Client
LBM Cochem-Koblenz – Rhineland-Palatinate State Mobility Authority
Services KOCKS ENGINEERS

Landscape conservation plan; faunistic studies; expert report on species protection; EIA report.

BP Nr. 329 – Gewerbegebiet “Bubenheimer Berg”

Die 20 ha große Bundesliegenschaft soll in ein Gewerbegebiet umgewandelt werden. Die geplante bauliche Nutzung dient somit dem Planungsziel der „Innenentwicklung“, da die Wiedernutzbarmachung von Flächen eines „Konversionsstandortes“ vorgesehen wird. Alle im Bebauungsplan verfolgten Teilfunktionen des Plangebiets stellen eine nachhaltige städtebauliche Entwicklung dar. In einem erheblichen Anteil des Plangebiets sollen bauliche Anlagen zurückgebaut und für Ausgleichsflächen umgewandelt werden. Weitere rund 5 ha sollen im Norden des Plangebiets als Freiflächen erhalten und entwickelt werden, weitere rund 4 ha Waldflächen des Plangebiets bleiben erhalten.

Client
Wirtschaftsförderungsgesellschaft (WFG) Koblenz mbH
Services KOCKS ENGINEERS
Erstelllung Antrag auf Städtebauförderungsmittel; städtebauliche Planungsleistungen zum Bebauungsplan und zur parallelen Flächennutzungsplanänderung; Umweltprüfung und Umweltbericht; Grünordnungsplan / Fachbeitrag Naturschutz; Verfahrensbegleitung; Erschließungsplanung (Verkehrs- und Entwässerungsplanung).

Umwelt- und Sozialverträglichkeitsstudie für den Ausbau der Zufahrtsstraße zum Kidunda Staudamm in Tansania

Verbesserung der Wasser- und Energieversorgung Tansanias durch den Kidunda Staudamm am Fluss Ruvu. Ausbau der Sandpiste zu einer befestigten Landstraße, um den Damm auch in der Regenzeit erreichen zu können. Begleitende Maßnahme: Erstellung einer umfassenden Umwelt- und Sozialverträglichkeitsstudie zum Schutz von Natur, Landschaft und ansässiger ländlicher Bevölkerung vor etwaigen negativen Auswirkungen des Entwicklungsvorhabens.

Client
Daressalam Water and Sewerage Authority
Services KOCKS ENGINEERS

Scoping Studie zur Ermittlung des Leistungsumfanges; Umwelt- und Sozialverträglichkeitsstudie für die Zufahrtsstraße; Durchführung von Konsultationen und Öffentlichkeitsterminen; Kumulative Eingriffsbewertung für Staudamm, Zufahrtsstraße sowie zugehörige Energieversorgungs- und Bewässerungseinrichtungen.

Measures for climate change adapted urban development in Barisal (Bangladesh), Phase I

Raising the road level on a total of 2.8 km of inner-city roads, including construction of drainage channels, to facilitate the accessibility of important infrastructure facilities such as hospitals, administrative offices and the police even in the event of climate change induced flooding. Construction of a total of 22 km of new drainage channels and rehabilitation of existing retention volumes to reduce flooding.

Client
City of Bangladesh / Kreditanstalt für Wiederaufbau (KfW)
Services KOCKS ENGINEERS
Project management; surveying; geotechnics; socio-economic studies; design; construction supervision; environmental and social impact assessments; education and training of local experts; preparation of operation and maintenance concepts.

Landfill gas utilisation Muertendall, Luxembourg

Construction of a combined heat and power plant to cover the heat requirements of the plant building and the landfill’s leachate treatment system, as well as feeding electricity into the local grid. Installation as a containerized module, including the necessary switch and control cabinet, directly next to the existing gas flare.

Client
SIGRE – Intercommunal syndicate for waste management in the regions Grevenmacher, Remich and Echternach, Luxembourg
Services KOCKS ENGINEERS

Design of combined heat and power plant; landfill gas utilisation concept; construction supervision.

Combined heat and power plant at Koblenz University of Applied Sciences

Replacement of the gas-fueled combined heat and power plant for heating support at Koblenz University of Applied Sciences. Replacement of the existing pipework with new, thermally insulated pipes. Replacement and integration of new gas, heat and electricity meters. Hydraulic integration into the buffer storage system and revision of the associated building management system.

Client
LBB – State property and construction management company
Services KOCKS ENGINEERS
Design and construction supervision.

District heating pipeline

Construction of a new district heating pipeline between various combined heat and power plants in Frankfurt with a total length of approx. 2.5 km. Crossing of the river Main with a DN 2500 culvert at a depth of 20 m and crossing of the track apron of Frankfurt Central Station with a total of 32 tracks, both by pipe jacking. Furthermore, the construction of special foundations, pipe bridges and special constructions was necessary.

Client
Netzdienste Rhein-Main GmbH
Services KOCKS ENGINEERS

Design and construction supervision of engineering structures; technical equipment; structural design and preliminary Environmental Impact Assessment.

Drinking water supply Kurdistan Northern Iraq

Securing the drinking water supply in initial reception centres for refugees and internally displaced persons and in host communities in the governorate of Dahuk, northern Iraq. Construction of a new water intake from Lake Mosul, a water treatment plant (5,000 m³/d), 18 km of transport pipes (DN 300 to DN 1200) and a water tank (12,000 m³).

Client
GIZ – Association for international cooperation
Services KOCKS ENGINEERS
Detailed design of the transport pipelines and a tank; preliminary design of a water treatment plant; tender documents, contract award, construction management, contract management.

Drainage Master Plan for the city of Dorsten

Revision and updating of the 1973 general drainage plan for eight districts in the Dorsten coal mining subsidence area. Supplementary planning and technical modernization of required special structures such as pumping stations, stormwater overflow basins and main collectors.

Client
Municipality of Dorsten; Lippeverband Essen; Deutsche Steinkohle AG
Services KOCKS ENGINEERS

Transient hydrodynamic sewer network calculation (HYSTEM-EXTRAN); pollutant load calculation; optimization of sewer network; surveying of sewer network; design and construction management of special structures; rehabilitation concepts; immission certificates in accordance with the Instruction sheet No. 3 issued by the Association of Engineers for Water Management, Waste Management and Cultural Engineering (German: BWK).

Reconstruction and expansion of the wastewater treatment plant Rodenbach

Expansion of the wastewater treatment plant from 16,000 PE to a final expansion stage of 18,000 PE. Construction of a new primary clarifying tank, including primary sludge pumping station, digestion tower, combined heat and power plant and gas storage tank. In addition, expansion and upgrading of the grit chamber and the aeration tank.

Client
Municipality of Rodenbach
Services KOCKS ENGINEERS
Design of civil engineering structures, structural design, technical equipment, local construction supervision.

Reconstruction and upgrading of the wastewater treatment plant Koblenz

Reconstruction and upgrading of the Koblenz wastewater treatment plant to ensure compliance with all ecological and economic requirements. Refurbishment of inlet building and mechanical systems. Refurbishment and expansion of biology. Increase in energy efficiency. Installation of new CHP plant. New sewage sludge drying plant. Photovoltaic system.

Client
SEK Koblenz – Urban drainage municipal corporation of the city of Koblenz
Services KOCKS ENGINEERS

Design of engineering structures; structural design, technical equipment; nature conservation assessment and local construction supervision.

Reconstruction and expansion of the wastewater treatment plant Haiger

Expansion of the wastewater treatment plant capacity to 35,200 PE by building a new two-stage activated sludge tank and converting the existing activated sludge tank into a four-stage secondary clarifying tank. Upgrading option for the addition of a 4th treatment stage for the elimination of micro-pollutants and conversion to anaerobic sludge stabilization.

Client
City of Haiger
Services KOCKS ENGINEERS
Design; construction supervision; technical equipment and electrical measurement and control facilities.

Kanalkataster und Kanalsanierung Verbandsgemeinde Emmelshausen

Erstellung eines Kanalsanierungskonzeptes für 20 Ortslagen der Verbandsgemeinde Emmelshausen, inklusive Bestandsanalyse zur Erfassung des dortigen Sanierungsbedarfs, sowie der Verbindungssammler Baybachtal und Emmelshausen.

Client
Verbandsgemeindeverwaltung Emmelshausen
Services KOCKS ENGINEERS

Zustandsklassifizierung und Zustandsbewertung des Kanalnetzes; Sanierungskonzept, einschließlich Kostenschätzung; Sanierungsplanung; Ausschreibung; Bauüberwachung.

Upgrading of the CAREC transport corridors in Tajikistan

Rehabilitation and upgrading of the Dushanbe-Kurgonteppa road (Afghan border) as part of the Central Asia Regional Economic Cooperation Programme (CAREC). Widening to four lanes from km 0 to km 34. Construction volume USD 55 million. Length 34 km, 9 bridges, 51 culverts DN 1,500, 21 culverts 2.0 x 2.0 to 4.5 x 2.5 m, estimated construction time 2 years; realised in joint venture with FinnOC, Finland.

Client
Ministry of Transport Tajikistan
Services KOCKS ENGINEERS
Construction supervision, site management, monitoring of environmental and social compliance.

Extension programme for Frankfurt Airport as a business location

Comprehensive design and construction supervision services for the land-side development of Terminal 3 at Frankfurt Airport. Technical advice to the client.

Client
Fraport AG / Fraport Ausbau Süd GmbH
Services KOCKS ENGINEERS

Design of the public and service road network including micro-simulation of traffic flows; drainage design; structural design for engineering structures such as bridges, retaining walls and sewage pumping stations; consulting and support for design amendment and approval procedures; construction phase planning; construction supervision.

Improvement of wastewater infrastructure at 15 university sites in Ethiopia

Support for the Ethiopian Ministry of the Environment in the design, construction and operation of 15 wastewater treatment plants at various university sites in the country.

Client
GIZ International Services
Services KOCKS ENGINEERS
Design and implementation of a training centre in Adama including mechanical workshop, electrical workshop, laboratories and seminar rooms; training courses for the operating staff of 150 employees at 15 wastewater treatment plants with regard to basic knowledge, operational management for sewer system and wastewater treatment plant as well as operation and maintenance; training of local…

Zehnstreifiger Ausbau der A 5, Frankfurt

Machbarkeitsstudie zum zehnstreifigen Ausbau der A 5 zwischen Autobahnkreuz Frankfurt und Anschlussstelle Friedberg (L=29 km), einschließlich Ausbau der Autobahnkreuze. Definition wissenschaftliche Grundlagen, technische Machbarkeit. In Arbeitsgemeinschaft mit BBW Bochum, Ruhr-Universität Bochum, Bosch & Partner.

Client
Hessen Mobil Straßen- und Verkehrsmanagement
Services KOCKS ENGINEERS

Technische Machbarkeit; Zwangspunktanalyse; Trassierung; Kostenschätzung.

PPTA zur Sanierung und Unterhaltung der CAREC Verkehrskorridore 1 und 3 auf 219 km, Kirgisistan

Unterstützung des Verkehrsministeriums im Rahmen einer Project preparatory technical assistance (PPTA). Straßenplanung und Identifikation von Verkehrssicherheitsmaßnahmen anlässlich der Aufstellung der Förderanträge bei internationalen Finanzierungsbanken.

Client
Regierung der Republik Kirgisistan
Services KOCKS ENGINEERS
Straßenverkehrssicherheitsaudit der Entwurfs- und Ausführungsplanung, Bewertung der Straßenverkehrssicherheit in Kirgisistan, Entwicklung einer Strategie zur effektiven Kommunikation von Straßenverkehrssicherheitsaspekten, Durchführung von Verkehrssicherheitsaudits und Unfallschwerpunktanalysen

Technical support for the Ukrainian Ministry of Transport in the implementation of the road safety project in Ukraine

Technical support and training of Ukrainian transport experts to prepare and implement suitable infrastructure measures to increase road safety in six major cities in Ukraine. Contributions to increasing road safety within the framework of the National Transport Strategy 2030, the National Road Safety Strategy (NRSS) and the Road Safety Programme (RSP) of the Ukrainian government.

Client
Ministry of Transport of Ukraine
Services KOCKS ENGINEERS

Development of suitable design guidelines for urban roads based on international best practice; analysis of accident data; technical support and training of Ukrainian transport experts at municipal and ministerial level; implementation of suitable training measures and workshops.

Road safety analysis of the plans to upgrade and extend the road from Zhinvali to Tsnori, Kakheti, Georgia

Supporting the Georgian Road Construction Authority in the strategic planning for the rehabilitation and extension of the Zhinvali-Bakurtsikhe-Tsnori road to 36 km. Preparation of road safety parameters for inclusion in the tender documents for the construction contract.

Client
Road construction authority of the Georgian Ministry of Transport
Services KOCKS ENGINEERS
Review of the road safety concept of the draft and detailed design; elaboration of the road safety parameters for inclusion in the tender documents.

Improving road safety on the CAREC Corridor No. 6 between Ayni and the Uzbek border

Contributions to the national action plan to improve road safety on Tajikistan’s inter-regional roads based on road safety analyses along the route from Ayni to the Uzbek border. Carrying out training and information campaigns in the communities along the route to raise awareness of traffic and road safety. Further education and training for employees of the Ministry of Transport.

Client
Ministry of Transport Tajikistan
Services KOCKS ENGINEERS

Implementation of road safety audits; preparation of a national action plan to improve road safety; implementation of training and information campaigns in the municipalities; further education and training of employees of the Ministry of Transport and subordinate authorities.

Consulting Services on climate-sensitive design for infrastructure projects in Mozambique

Development of strategies and training of government experts to consider the consequences of global climate change in infrastructure design processes.

Client
National Road Administration of Mozambique
Services KOCKS ENGINEERS
Consulting services and support to the Client in design reviews, policy definition and during construction; vulnerability assessments.
Verlegung neue Sprinklerzuleitung DN300

Sprinkler systems

Design and construction management of sprinkler systems in the automotive, glass and food industries.

Client
Automotive, glass, food and beverage industries
Services KOCKS ENGINEERS

Design and construction management.

Water Reuse in Industrial Parks (WaReIp)

Research project on the reuse of wastewater in industrial parks. Development of new treatment technologies for wastewater with high salt concentrations and high organic loads. Process selection through multi-objective optimization. Project partners: medium-sized companies, Chinese and German universities and associated pharmaceutical and chemical companies.

Client
Karlsruhe Institute of Technology. Project executing agency: Karlsruhe Water Technology and Waste Disposal (PTKA-WTE)
Services KOCKS ENGINEERS
Development of a measuring concept to ensure the wastewater quality; definition of a use-optimized, dynamic pipe network with changing pipe occupancy; participation in the identification of optimization potentials of the wastewater discharge; economic feasibility study for an operating and financing model.

Climate-induced adaptation of flood protection facilities in the north-east of Georgia

Flood protection concepts for four river sections in the north-east of Georgia (Lagodekhi, Pirveli, Senaki and Kobuleti), where flood protection facilities need to be renewed or rehabilitated due to progressive erosion.

Client
United Nations Development Programme (UNDP)
Services KOCKS ENGINEERS

Surveying of all river sections; preparation of soil surveys and GIS models for the catchment areas (up to 2,000 km²). Hydrological and hydraulic calculations with due regard to various climate change scenarios; modelling of sediment transport and erosion depths; planning and tendering of the necessary rehabilitation measures.

Wastewater treatment plant Zagreb – Technical Advisor Services

Technical, legal and economic assistance for the installation of the Zagreb wastewater treatment plant on a BOT (Built-Operate-Transfer) basis. The wastewater treatment plant was built in several construction phases with a capacity of up to 1.2 million population equivalents (PE), with the possibility of increasing the capacity to 1.5 million PE.

Client
Kreditanstalt für Wiederaufbau (KfW)
Services KOCKS ENGINEERS
Risk assessment, progress, cost, quality and risk management as well as operational monitoring.