International Consulting

Wastewater treatment plant Zagreb – Technical Advisor Services

Bilder 1 Images

Technical, legal and economic assistance for the installation of the Zagreb wastewater treatment plant on a BOT (Built-Operate-Transfer) basis. The wastewater treatment plant was built in several construction phases with a capacity of up to 1.2 million population equivalents (PE), with the possibility of increasing the capacity to 1.5 million PE.

Client
Kreditanstalt für Wiederaufbau (KfW)
Project Manager
Dipl.-Ing. Günter Becker
Services

Risk assessment, progress, cost, quality and risk management as well as operational monitoring.