Climate-sensitive Design, Training and Capacity Building
Measures for climate change adapted urban development in Barisal (Bangladesh), Phase I
1 Images
Raising the road level on a total of 2.8 km of inner-city roads, including construction of drainage channels, to facilitate the accessibility of important infrastructure facilities such as hospitals, administrative offices and the police even in the event of climate change induced flooding. Construction of a total of 22 km of new drainage channels and rehabilitation of existing retention volumes to reduce flooding.