Mechanical Engineering

New construction of finishing plant, Andernach

Bilder 1 Images

New construction of a steel hall (L / W / H = approx. 300 / 35 / up to 30 m) with crane operations (6 cranes up to 35 tons) for a tinplate finishing plant for the packaging industry, including several connecting structures. Construction of a media trough to house the production technology and of a switching house for the power supply, both in solid construction. New construction of the outdoor traffic areas.

Client
thyssenkrupp Rasselstein GmbH
Project Manager
Dipl.-Ing. Marcus Schneiders
Services

Structural design; BIM-orientated 3D design.