Federal Highways
Eight-lane widening of the A 40 motorway including replacement of the Rhine bridge Duisburg-Neuenkamp
1 Images
Multidisciplinary design of the new construction of the Rhine bridge Duisburg-Neuenkamp by the consortium Leonhardt, Andrä und Partner AG (Rhine bridge) and Kocks Consult GmbH (traffic system, drainage, noise protection) for DEGES. Construction of the upstream section of the structure in a temporary lateral position with subsequent transverse shifting. Design of the traffic facilities, including temporary traffic routing and construction site access. Design of the drainage including structural engineering.