Federal Highways

Eight-lane widening of the A 40 motorway including replacement of the Rhine bridge Duisburg-Neuenkamp

Bilder 1 Images

Multidisciplinary design of the new construction of the Rhine bridge Duisburg-Neuenkamp by the consortium Leonhardt, Andrä und Partner AG (Rhine bridge) and Kocks Consult GmbH (traffic system, drainage, noise protection) for DEGES. Construction of the upstream section of the structure in a temporary lateral position with subsequent transverse shifting. Design of the traffic facilities, including temporary traffic routing and construction site access. Design of the drainage including structural engineering.

Client
DEGES GmbH
Project Manager
Dr.-Ing. Manfred Heß
Services

Road design and design of the drainage systems including structural design; technical contribution on noise protection, design of noise protection measures; proportionality test according to § 41 (2) BImSchG (German Federal Immission Control Act); construction logistics; construction site management; assistance in the public participation procedure; assistance in the discussion procedure; adaption planning during construction.

Technical Information

8-streifiger Ausbau der A 40 auf einer Länge von 4,4 km; Ausbau Anschlussstelle Duisburg-Homberg; Ausbau Anschlussstelle Duisburg-Häfen; 2 Versickerungsbecken inkl. Regenklärbecken