Traffic Structures

Noise protection for the “Horchheimer Gärten” development area

Bilder 1 Images

Construction of a new noise barrier to protect the new “Horchheimer Gärten” residential development area near the motorway B 42 in Koblenz. A noise barrier with a height of up to 7 m was realised over a distance of approx. 300 m. The foundations were laid conventionally on bored piles. A pedestrian bridge over the B 42 was integrated into the wall.

Client
Projektgesellschaft Horchheim GmbH
Project Manager
Dipl.-Ing. Stefan Lietz
Services

Design and construction supervision of noise barrier.