Photovoltaic system in the vehicle hall of the Koblenz sewage treatment plant
Construction of a photovoltaic system on the vehicle hall of the Koblenz sewage treatment plant.
Text

Construction of a photovoltaic system on the vehicle hall of the Koblenz sewage treatment plant.
Renewal of the two existing excess sludge centrifuges at the wastewater treatment plant Jägersfreude including flocculation station.


Replacement of the existing precipitant dosing station (storage tank and dosing station in container) at the Dormagen-Rheinfeld sewage treatment plant.
Supply of the sewage sludge drying plant by planning a heating centre and a heating network at the Koblenz sewage treatment plant.


Construction of a new pumping station for pumping untreated, industrial and surface wastewater into an existing sewer.
Refurbishment of the pumping station at Bosener Mühle.


Installation of technical equipment for two pumping stations on the A 57 motorway.
Renewal of the outlet sewer from the main sewage treatment plant to the outlet structure into the Rhine over a length of approx. 2,400 metres with a diameter of DN 1200.


Reorganisation of the entire supply and disposal infrastructure in the course of the construction of the Riederwald Tunnel and relocation of the pipeline south of the planned tunnel tube.
Increase in quality of life in Tiandong Province through improvement of the ecological status of the Youjiang River. Among other things, implementation of measures to optimise wastewater discharge and treatment.


Assessment of an existing river water pumping station for the extraction of Main water with regard to its future use as a service water pumping station for cooling data centres and the new service water network in the former Griesheim industrial park.
Conversion of the area of around 73 hectares, which has been used as a chemical industry site since 1856, into a mixed-use area with manufacturing industry, service companies, data centres and start-ups. The existing drinking water supply network was hydraulically analysed and designed in line with the new purposes. Redesign of the entire service water network with utilisation of the treated water from the river Main to irrigate the green areas.


Replacement of a drinking water pipe (DN 400 grey cast iron) in an existing steel pipe crossing under the suburban railway line. Additional laying of a gas pipeline (OD 200 high density polyethylene) and four empty conduits for the laying of media cables. Design of a new emergency shaft structure for the drinking water pipeline.
The Asian Development Bank is planning to finance the upgrading of the 56 km stretch of road between Baljuvon and Sari Khosor. Initiative to improve road infrastructure with easier access to tourist attractions.


Six-lane widening of the A 45 motorway including replacement of the Engelsbach viaduct and traffic-friendly conversion of the connection to the motorway A 480.
Noise abatement programme to reduce the noise impact on nearby residents. New carriageway superstructure with noise-reducing road surface over a length of 3.6 km and construction of noise barriers to achieve the noise abatement values. Updating of the entire drainage system.


Rehabilitation and conversion of a shop floor for container glass and new construction of a filter system. Renewal of the facade, construction of bored pile walls, media ducts, floor slabs, foundations and supports for production facilities. Foundations for filters, exhaust pipes and chimney. Structural strengthening measures on the existing building.
Development of a 10 ha building site in the town of Reichelsheim/Wetterau.


Durchführung von Straßenverkehrssicherheitsaudits vor, während und nach der Bauausführung zum Ausbau der CAREC Verkehrskorridore 2, 5 und 6. Auswertung von Unfalldaten und Entwicklung geeigneter Sicherheitsrichtlinien. Durchführung von Workshops zur Steigerung der Verkehrssicherheitskompetenz tadschiikischer Verkehrsexperten.
Expansion and modernisation of an existing Opel engine plant in Poland. Enlargement of the production area including adjacent buildings. Construction of new transport and outdoor areas. New construction of the portal building. New installation of the entire electrical and media supply.


Replacement construction of the 380 kV switchgear using alternative gas technology and installation of a 380 kV compensating reactor. New construction of GIS building, reactor foundations, portal foundations, individual foundations, traffic areas, outdoor facilities.
Construction of a liquid natural gas (LNG) terminal in Brunsbüttel. Preparation of the authorisation documents for the building structures in accordance with state building regulations. Preparation of the preliminary structural analysis for the dimensioning of the building structures. Preparation of a drainage concept.


Construction of a deep pit to accommodate the regenerative chamber for the glass melting furnace. Conversion of machine cellar and batch house. Design of the foundation for the new flue gas cleaning plant, including open spaces.
Conversion of the existing terrace slab production into a production facility for paving stones. Dismantling of the existing old production machinery and construction of the new production plant. Structural adaptations to existing facilities and planning of outdoor storage areas. Revision of the land use- and development plan. Obtainment of building applications with particular authorization to build in the drinking water protection area.


Conversion and new construction to expand the production area (65,000 m²) for the new engine production.
Rehabilitation and maintenance of the Bornheim sewer network. Supporting the client’s substance- and area-related rehabilitation strategy by viewing, analysing and documenting video inspections of examined sewers and manholes.


Relocation and rehabilitation of the over 100-year-old elliptical masonry sewer “Alter Bergsammler” at the University Hospital in Frankfurt. Relocation over a length of approx. 325 m using a circular profile (2.80 m internal diameter) by pipe jacking. Rehabilitation of significant damage over a length of approx. 170 m with GRP short pipes. Structural adaptation of existing media lines and infrastructure tunnels of the University Hospital.
Commercial land development concept for the expansion of the freight transport centre in Koblenz. Update of the reserve land register and preparatory study for the development measure according to § 165 of the Federal Building Code.


Conversion of a former industrial area into a residential area in an attractive location with a size of approx. 8 ha. New construction of approx. 2,000 m² outer development road and approx. 13,000 m² inner development roads; new construction of approx. 4,200 m rainwater and wastewater sewers; new construction of a stream pipe as a frame profile.
Feasibility study to improve the cycling network in the city of Koblenz. Investigation of 19 main cycle routes with a total length of approx. 90 km in the city area and revision of the main route concept including condition survey, action plan and prioritisation.

You need to load content from reCAPTCHA to submit the form. Please note that doing so will share data with third-party providers.