Civil and Foundation Engineering
Deep pile foundation over a peat bog


Construction of an overpass of the L 354n road over the river Niers near Mönchengladbach. In the area of a peat bog. The ramps have to be founded on driven piles in a grid of approx. 2 x 2 metres with a pile length of 8 metres. The bridge itself is founded as a single-span structure on in-situ concrete piles.