Civil and Foundation Engineering

Deep pile foundation over a peat bog

Bilder 1 Images

Construction of an overpass of the L 354n road over the river Niers near Mönchengladbach. In the area of a peat bog. The ramps have to be founded on driven piles in a grid of approx. 2 x 2 metres with a pile length of 8 metres. The bridge itself is founded as a single-span structure on in-situ concrete piles.

Client
RWE Power AG, Cologne
Project Manager
Dipl.-Ing. Stefan Lietz
Services

Variant analysis and design for the deep section foundation and bridge; application for authorisation under water law for the temporary stream piping.