Networks

Drinking water supply Kurdistan Northern Iraq

Securing the drinking water supply in initial reception centres for refugees and internally displaced persons and in host communities in the governorate of Dahuk, northern Iraq. Construction of a new water intake from Lake Mosul, a water treatment plant (5,000 m³/d), 18 km of transport pipes (DN 300 to DN 1200) and a water tank (12,000 m³).

Client
GIZ – Association for international cooperation
Services KOCKS ENGINEERS

Detailed design of the transport pipelines and a tank; preliminary design of a water treatment plant; tender documents, contract award, construction management, contract management.

Drinking water pipeline Hochwald

Construction of a 6.8 km long DN 300 drinking water pipeline and a pressure booster station.

Client
Hochwald Foods Whey Ingredients GmbH
Services KOCKS ENGINEERS
Environmental impact assessment; design; construction supervision.

Relocation of the gas and drinking water pipeline under the railway overpass at Frankenallee

Replacement of a drinking water pipe (DN 400 grey cast iron) in an existing steel pipe crossing under the suburban railway line. Additional laying of a gas pipeline (OD 200 high density polyethylene) and four empty conduits for the laying of media cables. Design of a new emergency shaft structure for the drinking water pipeline.

Client
NRM Netzdienste Rhein-Main GmbH
Services KOCKS ENGINEERS

Design for civil engineering structures; structural design, documentation for crossing with railway line; health and safety coordination; construction supervision.

Renewal of drinking and service water supply Westside Frankfurt

Conversion of the area of around 73 hectares, which has been used as a chemical industry site since 1856, into a mixed-use area with manufacturing industry, service companies, data centres and start-ups. The existing drinking water supply network was hydraulically analysed and designed in line with the new purposes. Redesign of the entire service water network with utilisation of the treated water from the river Main to irrigate the green areas.

Client
BEOS AG, Schüßler-Plan GmbH
Services KOCKS ENGINEERS
Design of engineering structures; construction supervision.

Special Purpose Structures

Drinking water treatment for the water supply Dohuk, Iraq

Securing the drinking water supply in initial reception centres for refugees and internally displaced persons and in host communities in the governorate of Dohuk, northern Iraq. Construction of a new water intake from Lake Mosul, a water treatment plant (5,000 m³/d), 18 km of transport pipes (DN 300 to DN 1200) and a water tank.

Client
GIZ – Association for international cooperation
Services KOCKS ENGINEERS

Functional design, contract award and construction supervision for the intake building and drinking water treatment of the surface water with a capacity of 2,500 m³/h.

Upgrading of the river water pumping station at the former industrial estate at Griesheim

Assessment of an existing river water pumping station for the extraction of Main water with regard to its future use as a service water pumping station for cooling data centres and the new service water network in the former Griesheim industrial park.

Client
CP Siebte Objektgesellschaft GmbH & Co. KG
Services KOCKS ENGINEERS
Design of service water network; mechanical assessment of existing pumping station and preparation of catalogue of measures, permit applications for withdrawal and discharge of Main water (max. 2 m³/s).

Hochbehälter für die Wasserversorgung Dohuk, Irak

Sicherung der Trinkwasserversorgung in Erstaufnahmelagern für Flüchtlinge und Binnenvertriebene sowie in aufnehmenden Gemeinden im Gouvernement Dohuk, Nordirak. Neubau einer Wasserentnahme aus dem Mossul-See, einer Wasseraufbereitungsanlage (5.000 m³/d), 18 km Transportleitungen (DN 300 bis DN 1200) und eines Hochbehälters (Volumen 4 x 3.500 m³).

Client
Gesellschaft für Internationale Zusammenarbeit (GIZ)
Services KOCKS ENGINEERS

Ausführungsplanung, Vergabe und Bauleitung eines Hochbehälters in Betonbauweise.