Civil and Foundation Engineering

Structural shoring design for wastewater pumping stations 15 and 16 at Fraport

Bilder 1 Images

Construction of two pumping stations for pumping the wastewater from the new Terminal 3 to the existing wastewater treatment plant. Due to high groundwater levels and a very permeable subsoil, extensive special civil engineering work was necessary. Sheet piling was used in conjunction with a back-anchored underwater concrete base.

Client
Fraport AG
Project Manager
Dipl.-Ing. Stefan Lietz, Dipl.-Ing. Oliver Hömmerich
Services

Design and construction supervision for engineering structures; technical equipment (mechanical and electrical engineering).