Civil and Foundation Engineering
Structural shoring design for wastewater pumping stations 15 and 16 at Fraport
1 Images
Construction of two pumping stations for pumping the wastewater from the new Terminal 3 to the existing wastewater treatment plant. Due to high groundwater levels and a very permeable subsoil, extensive special civil engineering work was necessary. Sheet piling was used in conjunction with a back-anchored underwater concrete base.