Civil and Foundation Engineering

Engineering structures for the renaturation of the river Emscher

Bilder 1 Images

As part of the Emscher renaturation, extensive plans were drawn up for both the excavation pits and the engineering structures for the stormwater overflow basin at Gladbecker Straße, the storage canal at Berger Feld and the stormwater overflow basins at Sutum and Springbach .

Client
Emscher Wassertechnik GmbH / Emschergenossenschaft
Project Manager
Dipl.-Ing. Stefan Lietz
Services

Structural design; preparation of formwork and reinforcement plans.