Power Supply

12 kV cable route for the solar park “Veynau”

Bilder 1 Images

Construction of a 12 kV cable route for feeding the Veynau solar park into the existing power grid with a length of 3.5 km from Wißkirchen to Euskirchen. Undercrossing of two railway lines and a water crossing using pipe jacking and HDD (Horizontal Directional Drilling) methods.

Client
Veynau Solar Park GmbH
Project Manager
Dipl.-Ing. Stefan Gruß
Services

Design and construction supervision.