12 kV cable route for the solar park “Veynau”
1 Images
Construction of a 12 kV cable route for feeding the Veynau solar park into the existing power grid with a length of 3.5 km from Wißkirchen to Euskirchen. Undercrossing of two railway lines and a water crossing using pipe jacking and HDD (Horizontal Directional Drilling) methods.