Power Supply

110 kV cable route Ostbahnhofstrasse, Frankfurt

Bilder 1 Images

Renewal of a 110 kV oil-filled cable with investigation of four route variants in a very cramped city centre location over a length of 1.6 km.

Client
Netzdienste Rhein-Main GmbH
Project Manager
Dipl.-Ing. Alexander Weiß
Services

Design of engineering structures and overall route plans.