Upgrading of Canouan Island Airport, St Vincent and the Grenadines, Caribbean

Upgrading of the runway to make the tourist airport on the island jet-capable. Extension of the runway to 1,070 metres by reclamation of land into the sea. Construction of the new lighting system and tower.

Client
Ministry of Transport & Works
Services KOCKS ENGINEERS

Inventory and preparation of the master plan for the expansion of the airport; environmental impact assessment and economic feasibility study; detailed design; tendering; construction supervision; client consultancy.

Extension programme for Frankfurt Airport as a business location

Comprehensive design and construction supervision services for the land-side development of Terminal 3 at Frankfurt Airport. Technical advice to the client.

Client
Fraport AG / Fraport Ausbau Süd GmbH
Services KOCKS ENGINEERS
Design of the public and service road network including micro-simulation of traffic flows; drainage design; structural design for engineering structures such as bridges, retaining walls and sewage pumping stations; consulting and support for design amendment and approval procedures; construction phase planning; construction supervision.

Rehabilitation and modernisation of Mazar i Sharif Airport, Afghanistan

Upgrading of the airport in Mazar i Sharif, Afghanistan. Rehabilitation of the old runway (total length 3,160 metres) including the associated drainage system, ILS and lighting system. Land-side development and expansion of the civilian area including terminal, office and administration buildings, drinking water treatment and supply. Upgrading of the airside facilities with apron extension, remodelling of the existing runway. Construction of the new tower cockpit including technical equipment. Supervision of the installation of the MLAT approach system.

Client
Afghan Civil Aviation Authority (project financing KfW)
Services KOCKS ENGINEERS

Feasibility studies and detailed design according to international standards and ICAO guidelines; construction contract according to FIDIC Yellow Book; project management and construction supervision on site.

Mostar International Airport

Expansion of the airport for a period of 30 years, including expansion of the terminal capacity through conversion and long-term new construction, the widening of taxiways as well as the extension and renovation of apron areas.

Client
PLANET S.A., Athens, Greece
Services KOCKS ENGINEERS
Inventory of land-side and air-side infrastructure, electrotechnical equipment, NAVAIDS, communication facilities, terminal; target/actual comparison; determination of a flight operation area overlay in asphalt; air-side and land-side development concept; renewal of electrotechnical equipment and navigation facilities; cost estimate and investment plan.