Networks
Backup water supply system in the Ahr Valley
Design of 4.5 km of drinking water transmission pipelines, two pumping stations with a head of up to 300 m, and an elevated tank with a usable volume of 1,000 m³. Hydraulic verification of 27 km of transmission pipelines.