30 kV grid extension – mini-tunnel

Bilder 1 Images

Network extension between two existing substations by crossing a busy transport hub (including railway tracks) using a 100-metre-long DN 1300 segment-driven tunnel at a depth of 8 metres. Insertion of the pre-assembled empty conduit package into the tunnel via the launch pit once the tunnel has been completed. Final connection to the cable conduit route that has already been laid.

Client
Grid Services Netzdienste Rhein Main GmbH
Services

Design and construction supervision.